LOADING

Making of Animus Room

PROJECT
AGNITIO INDUSTRIES
SOFTWARES
RHINOCEROS 5
RENDERED WITH
VRAY 2
RENDER TIME
3 HOURS

 

 

1

HVAC systems are modeled by using only surfaces. Cables are modeled by using “pipe” command.

2

Working with “Wireframe” display mode very useful. HVAC systems are placed next to each other.

3

After making a glass ground, all the cables are put underneath the glass panels to create a futuristic environment.

4

After all these materials applied on model, it is ready to render.

Click here to see the project

LEAVE A REPLY